2026 Revenue Bond Sales
The city locked in 3.17% on $19 million in GO bonds and 2.726% on $173 million in temporary notes — the lowest rates since 2021 and 2022 — financing fire stations, street reconstruction, the 135th Street retaining wall and legacy projects.
Series 2026 Revenue Bonds — Stormwater and Water/Sewer
Olathe locked in good rates on this year's utility bonds: 4.5% for water and sewer and 4.9% for stormwater, funding ongoing utility system improvements.
Stormwater drainage onto neighboring properties
Residents — including a professional engineer — argued the site's drainage plan routes all stormwater onto adjacent properties rather than city systems, raising flood concerns for backyards already prone to sogginess. Staff said detention basins will ensure no increase in peak runoff.
Black Bob Park Water Tower No. 2 completion
The repainted Black Bob Park water tower is done, matches its neighbor tower, and came in $27,500 under budget.
Adopting 2025 Johnson County health codes
The city needs to re-adopt the county's updated health codes so county enforcement keeps working inside city limits — sanitary rules barely change, but the aquatic code gives the city more power over public and semi-public pools (not backyard pools).
2027 Utility Rates and Capital Improvement Plan
Residents will pay about $9.23 more per month across water, sewer, stormwater, and trash bills in 2027, driven by mandated wastewater upgrades and inflation. Staff flagged a looming $140 million biosolids project and a growing water main rehabilitation backlog.
Super Critical Water Oxidation Pilot Project
Olathe is piloting only the third unit of its kind in the country to turn sewage biosolids into water and mineral slurry — cutting landfill costs about $58,000/year at the pilot scale and potentially destroying PFAS. Nearly $5.8 million of it is a fully forgivable state loan.
103rd Street Lift Station Replacement
The city took two steps — a land survey and land acquisition authority — to upgrade the sewer lift station serving the Cedar Creek area.